The reconstruction of Truskavetska Street has started in the Darnytskyi district of Kyiv
The street will be completely renovated.
According to the Darnytskyi district state administration, street lighting, a bike path, and greenery will appear on Truskavetska Street.
It is reported that a coordination meeting was held to begin the reconstruction of Truskavetska Street, attended by the acting head of the Darnytskyi district state administration Mykola Kalashnyk and the head of the capital construction department of “Kyivavtodor” Pavel Monastyrnyi.
The following work will be carried out on the object:
– laying of road and sidewalk surfaces;
– replacement of the stormwater sewer system with the installation of a bike path;
– installation of a storm drainage system;
– renewal of greenery;
– installation of street lighting.
The total length of the section is 526.14 meters, the area of the roadway is 7,100 sq. m., the area of the sidewalks is 3,740 sq. m., the area of the bike paths is 2,700 sq. m., and the area of landscaping and greenery is 3,300 sq. m.